Primary features of the modular construction

Revolutionary principle of assembly of finished blocks which can be turned into an accomplished building  in a few weeks.

Pace of construction

The advantage of the modular method of construction is a short term of production of modules and their rapid installation. Reduction of  time is also reached due to the simultaneous process of preparation of a  site and basal complex and production of modules.

The industrial production of modules takes the main period of construction and  that minimizes the costs of works in cramped quarters in large cities.

In addition, the expansion and the superstructure of the existing building, in most cases, will not interrupt usual process of work in its working parts.

The quality of modular construction is provided with the usage of high quality materials and technology that meets highest international demands.

Buildings constructed by “Chandler Bau” in a modular technology are made in accordance with all the assessment criteria for good quality standards, control certificate, toxicology, and year certified by DIN EN ISO 9001:2008

This has been proved by practical  use of modular buildings in specific premises defined as “high purity” such as operating rooms and reanimation premises of, laboratories and clinics, which must always be constructed in accordance with the biological and physical demands typical for such institutions.

The warranty on construction of the modular blocks is at least 30 years.

Modules Transportation

The network of “Chandler” branches makes it possible to organize the constant transportation of loads all over the world.Chandler Bau uses the experience of Chandler Company on the elaboration and implementation of the multi-modal delivery schemes to any destination worldwide, using all modes of transportation: sea, road, rail, and air.

Where is it necessarily, Chandler Company ensures the delivery of oversized modules and their components; for instance, in  2007-2008 were transported 1093 oversized modules  and 193 trucks with additional equipment and materials for the construction of medical centers within the State “Health” project

Debugged possibility of modules transportation to any remote place of the world significantly extends “the geography” of modular construction.